Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 3724 | Aircraft Engines And Engine Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0998 # 09 Y:2019 | 09 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,344 | $2,520 | Not Implemented |
UD0998 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,135 | $5,000 | Not Implemented |
UD0998 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,380 | $1,315 | Not Implemented |
UD0998 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,128 | $0 | Not Implemented |
UD0998 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,189 | $3,500 | Not Implemented |
UD0998 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $965 | $280 | Not Implemented |
UD0998 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,888 | $40 | Not Implemented |
UD0998 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $10,815 | $2,500 | Not Implemented |
UD0998 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,093 | $0 | Not Implemented |
UD0734 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,890 | $19,500 | Implemented |
UD0734 # 04 Y:2006 | 04 | 2006 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $2,800 | $0 | Implemented |
UD0734 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $935 | $0 | Not Implemented |
UD0734 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,798 | $8,041 | Implemented |
UD0734 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM THICKNESS INSULATION | $2,141 | $3,500 | Not Implemented |
UD0734 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $53 | Implemented |
UD0734 # 10 Y:2006 | 10 | 2006 | USE PHOTOCELL CONTROLS | $477 | $275 | Implemented |
UD0734 # 09 Y:2006 | 09 | 2006 | REDUCE VENTILATION AIR | $750 | $0 | Implemented |
UD0734 # 02 Y:2006 | 02 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,301 | $0 | Not Implemented |
UD0734 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,023 | $1,900 | Implemented |
UD0734 # 05 Y:2006 | 05 | 2006 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,510 | $0 | Implemented |
UD0715 # 04 Y:2005 | 04 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,597 | $500 | Implemented |
UD0715 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,021 | $0 | Implemented |
UD0715 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,689 | $0 | Not Implemented |
UD0715 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $781 | $340 | Implemented |
UD0715 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $130 | Not Implemented |