Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
144
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0578 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,065 | $1,710 | Implemented |
UF0578 # 02 Y:2022 | 02 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $12,457 | $4,590 | Not Implemented |
UF0578 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,461 | $390 | Implemented |
UF0578 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,930 | $0 | Implemented |
UF0578 # 05 Y:2022 | 05 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $7,688 | $0 | Implemented |
UF0578 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,829 | $2,419 | Implemented |
UF0578 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,565 | $25,400 | Not Implemented |
UF0578 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $15,842 | $11,742 | Implemented |
MI0394 # 07 Y:2021 | 07 | 2021 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,040 | $616 | Not Implemented |
MI0394 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,427 | $1,980 | Implemented |
MI0394 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,836 | $2,100 | Not Implemented |
MI0394 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,060 | $14,609 | Not Implemented |
MI0394 # 03 Y:2021 | 03 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,170 | $2,549 | Not Implemented |
MI0394 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,537 | $1,380 | Not Implemented |
MI0394 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,463 | $480 | Implemented |
MI0394 # 08 Y:2021 | 08 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,367 | $2,549 | Implemented |
MI0391 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,293 | $2,100 | Implemented |
MI0391 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,208 | $5,468 | Not Implemented |
MI0391 # 06 Y:2021 | 06 | 2021 | INSTALL OCCUPANCY SENSORS | $3,068 | $1,728 | Implemented |
MI0391 # 07 Y:2021 | 07 | 2021 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $444 | $89 | Not Implemented |
MI0391 # 03 Y:2021 | 03 | 2021 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,712 | $7,497 | Not Implemented |
MI0391 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,882 | $1,980 | Implemented |
MI0391 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,221 | $18,127 | Not Implemented |
MI0389 # 10 Y:2021 | 10 | 2021 | COMBINE UTILITY METERS | $776 | $240 | Not Implemented |
MI0389 # 01 Y:2021 | 01 | 2021 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $48,176 | $80 | Not Implemented |