Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0619 # 01 Y:2013 | 01 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,073 | $2,342 | Not Implemented |
OR0619 # 02 Y:2013 | 02 | 2013 | REDUCE FLUID FLOW RATES | $2,879 | $6,200 | Not Implemented |
OR0619 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,300 | $50,000 | Not Implemented |
OR0619 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,667 | $2,342 | Not Implemented |
OR0619 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,550 | $13,225 | Not Implemented |
UW0024 # 05 Y:2009 | 05 | 2009 | MINIMIZE WATER USAGE | $3,573 | $0 | Implemented |
UW0024 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,586 | $0 | Implemented |
UW0024 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $889 | $0 | Implemented |
UW0024 # 02 Y:2009 | 02 | 2009 | USE POWER DURING OFF-PEAK PERIODS | $4,202 | $400 | Not Implemented |
UW0024 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,517 | $48,000 | Implemented |
UW0003 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $929 | $2,100 | Implemented |
UW0003 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $905 | $1,200 | Implemented |
UW0003 # 04 Y:2007 | 04 | 2007 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,551 | $7,020 | Implemented |
UW0003 # 03 Y:2007 | 03 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,723 | $20,750 | Not Implemented |
UW0003 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,385 | $50,000 | Not Implemented |
OR0512 # 05 Y:2006 | 05 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $4,400 | $7,500 | Implemented |
OR0512 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,300 | $5,000 | Implemented |
OR0512 # 03 Y:2006 | 03 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,000 | $5,000 | Implemented |
OR0512 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $32,700 | $20,600 | Not Implemented |
OR0512 # 01 Y:2006 | 01 | 2006 | INSTALL OCCUPANCY SENSORS | $100,600 | $5,500 | Implemented |
OR0259 # 06 Y:1996 | 06 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,611 | $0 | Implemented |
OR0259 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,337 | $11,047 | Not Implemented |
OR0259 # 04 Y:1996 | 04 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $663 | $1,454 | Implemented |
OR0259 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $1,599 | $1,436 | Implemented |
OR0259 # 02 Y:1996 | 02 | 1996 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $584 | $0 | Implemented |