Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,680
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0672 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $0 | Not Implemented |
OK0672 # 06 Y:2003 | 06 | 2003 | OPTIMIZE PLANT POWER FACTOR | $1,292 | $8,190 | Not Implemented |
OK0672 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,225 | $262 | Implemented |
OK0672 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,952 | $28,902 | Not Implemented |
OK0672 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $578 | $488 | Not Implemented |
LE0164 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,136 | $150 | Not Implemented |
LE0164 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,194 | $4,000 | Not Implemented |
LE0164 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,205 | $0 | Not Implemented |
LE0164 # 04 Y:2003 | 04 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $175 | $98 | Not Implemented |
LE0164 # 05 Y:2003 | 05 | 2003 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $5,397 | $0 | Not Implemented |
LE0164 # 06 Y:2003 | 06 | 2003 | COMBINE UTILITY METERS | $864 | $3,000 | Not Implemented |
LE0164 # 07 Y:2003 | 07 | 2003 | COMBINE UTILITY METERS | $3,442 | $3,000 | Not Implemented |
LE0164 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,379 | $149 | Not Implemented |
LE0164 # 09 Y:2003 | 09 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,359 | $5,100 | Not Implemented |
LE0164 # 10 Y:2003 | 10 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,007 | $1,050 | Not Implemented |
LE0164 # 11 Y:2003 | 11 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,436 | $2,500 | Not Implemented |
SU0166 # 01 Y:2003 | 01 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,012 | $232 | Not Implemented |
SU0166 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,388 | $480 | Not Implemented |
SU0166 # 03 Y:2003 | 03 | 2003 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $28,125 | $10,016 | Implemented |
SU0166 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,270 | $24,797 | Not Implemented |
SU0166 # 05 Y:2003 | 05 | 2003 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $24,000 | $19,912 | Not Implemented |
SU0166 # 06 Y:2003 | 06 | 2003 | USE EXISTING DAM TO GENERATE ELECTRICITY | $49,025 | $132,000 | Not Implemented |
SU0166 # 07 Y:2003 | 07 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,000 | $68,560 | Implemented |
UD0676 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,216 | $6,000 | Implemented |
UD0676 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,997 | $5,000 | Not Implemented |