Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,696
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0263 # 05 Y:1996 | 05 | 1996 | OPTIMIZE PLANT POWER FACTOR | $3,319 | $9,400 | Not Implemented |
OR0263 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $966 | $3,352 | Not Implemented |
OR0259 # 01 Y:1996 | 01 | 1996 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $7,505 | $0 | Implemented |
OR0259 # 02 Y:1996 | 02 | 1996 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $584 | $0 | Implemented |
OR0259 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $1,599 | $1,436 | Implemented |
OR0259 # 04 Y:1996 | 04 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $663 | $1,454 | Implemented |
OR0259 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,337 | $11,047 | Not Implemented |
OR0259 # 06 Y:1996 | 06 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,611 | $0 | Implemented |
AS0155 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $418 | $500 | Not Implemented |
AS0155 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,821 | $750 | Implemented |
AS0155 # 03 Y:1995 | 03 | 1995 | USE SYNTHETIC LUBRICANT | $1,941 | $0 | Implemented |
AS0155 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,414 | $36,039 | Not Implemented |
AS0155 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $855 | $2,592 | Not Implemented |
AS0155 # 06 Y:1995 | 06 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $315 | $500 | Not Implemented |
AS0155 # 07 Y:1995 | 07 | 1995 | INSULATE BARE EQUIPMENT | $859 | $368 | Not Implemented |
AS0155 # 08 Y:1995 | 08 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,336 | $9,686 | Not Implemented |
AS0155 # 09 Y:1995 | 09 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $310 | $0 | Not Implemented |
AS0155 # 10 Y:1995 | 10 | 1995 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $2,007 | $10,000 | Not Implemented |
AS0151 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,172 | $6,162 | n/a |
AS0151 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,785 | $0 | n/a |
AS0151 # 03 Y:1995 | 03 | 1995 | USE SYNTHETIC LUBRICANT | $2,539 | $300 | n/a |
AS0151 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $187 | $100 | n/a |
AS0151 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $460 | $850 | n/a |
AS0151 # 06 Y:1995 | 06 | 1995 | USE RADIANT HEATER FOR SPOT HEATING | $1,638 | $8,104 | n/a |
AS0151 # 07 Y:1995 | 07 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,656 | $7,000 | n/a |