IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,625

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0113 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $547 $2,110 Not Implemented
AS0113 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,076 $3,108 Implemented
AS0113 # 07 Y:1994 07 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,531 $20,250 Not Implemented
KU0422 # 01 Y:1994 01 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $502 $3,380 Implemented
KU0422 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $148 $1,575 Implemented
KU0422 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $1,703 Implemented
KU0422 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $275 $1,300 Implemented
KU0422 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $166 $416 Implemented
KU0422 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95 $200 Implemented
KU0422 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71 $128 Implemented
KU0422 # 08 Y:1994 08 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $451 $608 Implemented
KU0422 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $332 $110 Implemented
KU0422 # 10 Y:1994 10 1994 RECOVER WASTE HEAT FROM EQUIPMENT $139 $80 Not Implemented
KU0422 # 11 Y:1994 11 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Implemented
CO0287 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,770 $7,180 Not Implemented
CO0287 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,180 $16,170 Implemented
CO0287 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,360 $2,500 Not Implemented
CO0285 # 01 Y:1993 01 1993 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $92,610 $6,220 Not Implemented
CO0285 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $9,680 $2,010 Not Implemented
CO0285 # 03 Y:1993 03 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,720 $8,500 Not Implemented
CO0285 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $7,020 Not Implemented
CO0285 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $130 Not Implemented
CO0285 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $1,400 $480 Not Implemented
CO0285 # 07 Y:1993 07 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,540 $750 Not Implemented
CO0285 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,540 $1,000 Not Implemented