IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0011 # 02 Y:2001 02 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $73,364 $5,100 Implemented
MI0011 # 03 Y:2001 03 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $18,892 $5,100 Implemented
MI0011 # 04 Y:2001 04 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $114,007 $5,100 Implemented
MI0011 # 05 Y:2001 05 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $316,160 $164,000 Implemented
MI0011 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,793 $19 Implemented
MI0011 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,662 $760 Not Implemented
MI0001 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,545 $200 Not Implemented
MI0001 # 02 Y:2001 02 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $24,240 $20,000 n/a
MI0001 # 03 Y:2001 03 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $96,000 $25,000 Implemented
MI0001 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,041 $1,360 Not Implemented
MI0001 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $60 Implemented
UF0114 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,049 $2,639 Implemented
UF0114 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $2,432 $256 Not Implemented
UF0114 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,442 $2,820 Not Implemented
UF0114 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $300 Not Implemented
UF0114 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,847 $350 Implemented
UF0114 # 06 Y:1995 06 1995 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,128 $5,933 Implemented
UF0114 # 07 Y:1995 07 1995 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $5,040 $4,450 Not Implemented
UF0114 # 08 Y:1995 08 1995 RECOVER AND REUSE WASTE MATERIAL $2,180 $0 Implemented