IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0698 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,000 $1,500 Not Implemented
CO0698 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $500 Implemented
CO0698 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,800 $16,900 Implemented
CO0698 # 01 Y:2014 01 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,950 $300 Not Implemented
CO0542 # 03 Y:2004 03 2004 USE SOLAR HEAT TO HEAT WATER $970 $3,780 Not Implemented
CO0542 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,380 $52,440 Implemented
CO0542 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $4,900 $18,630 Implemented
CO0542 # 04 Y:2004 04 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $530 $250 Implemented
CO0542 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,300 $1,860 Implemented
CO0542 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,390 $600 Implemented
CO0501 # 08 Y:2002 08 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $137,140 $300,000 Not Implemented
CO0501 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,440 $2,000 Not Implemented
CO0501 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,890 $12,000 Not Implemented
CO0501 # 09 Y:2002 09 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,230 $6,500 Not Implemented
CO0501 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $11,610 $1,980 Not Implemented
CO0501 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $5,020 $2,000 Not Implemented
CO0501 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $620 $500 Not Implemented
CO0501 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $9,180 $10,000 Not Implemented
CO0501 # 06 Y:2002 06 2002 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,900 $0 Not Implemented
CO0394 # 04 Y:1997 04 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $6,360 $22,200 Not Implemented
CO0394 # 06 Y:1997 06 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,000 $23,500 Not Implemented
CO0394 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,530 $0 Not Implemented
CO0394 # 05 Y:1997 05 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $5,740 $5,680 Not Implemented
CO0394 # 08 Y:1997 08 1997 $330,000 $0 Not Implemented
CO0394 # 03 Y:1997 03 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,760 $10,000 Not Implemented