IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0602 # 06 Y:1996 06 1996 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $1,044 $3,500 Not Implemented
GT0602 # 05 Y:1996 05 1996 INCREASE USE OF AUTOMATION $20,487 $8,000 Not Implemented
GT0602 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $1,000 Implemented
GT0602 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $690 $300 Implemented
GT0602 # 02 Y:1996 02 1996 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,330 $500 Not Implemented
GT0602 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $41,960 $76,100 Not Implemented
AS0174 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,360 $4,136 Not Implemented
AS0174 # 09 Y:1996 09 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,188 $0 Implemented
AS0174 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $2,789 $900 Implemented
AS0174 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $743 $0 Not Implemented
AS0174 # 05 Y:1996 05 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,434 $0 Implemented
AS0174 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,815 $39,642 Implemented
AS0174 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $0 Implemented
AS0174 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $717 $120 Implemented
AS0174 # 08 Y:1996 08 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,663 $8,000 Not Implemented
OR0263 # 05 Y:1996 05 1996 OPTIMIZE PLANT POWER FACTOR $3,319 $9,400 Not Implemented
OR0263 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,202 $7,023 Implemented
OR0263 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $14,343 $15,100 Not Implemented
OR0263 # 02 Y:1996 02 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $69,830 $183,000 Not Implemented
OR0263 # 01 Y:1996 01 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $61,134 $20,900 Implemented
OR0263 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $3,352 Not Implemented
OR0259 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,337 $11,047 Not Implemented
OR0259 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $663 $1,454 Implemented
OR0259 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $1,599 $1,436 Implemented
OR0259 # 02 Y:1996 02 1996 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $584 $0 Implemented