IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3732 Boat Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0270 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $881 $1,200 Not Implemented
TT0270 # 06 Y:2022 06 2022 USE SOLAR HEAT FOR HEAT $1,092 $4,800 Not Implemented
TT0270 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,201 $2,240 Not Implemented
TT0270 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,829 $40 Not Implemented
TT0270 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,877 $2,770 Implemented
TT0270 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,525 $50 Implemented
TT0270 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,427 $2,000 Implemented
TN0686 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $7,260 $18,810 Not Implemented
TN0686 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $760 $925 Not Implemented
TN0686 # 08 Y:2000 08 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,280 $600 Not Implemented
TN0686 # 07 Y:2000 07 2000 INSTALL SKYLIGHTS $2,460 $7,100 Not Implemented
TN0686 # 06 Y:2000 06 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,510 $4,780 Not Implemented
TN0686 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $5,550 $1,120 Not Implemented
TN0686 # 03 Y:2000 03 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $9,000 $5,960 Implemented
TN0686 # 02 Y:2000 02 2000 $24,000 $50,000 Not Implemented
TN0686 # 01 Y:2000 01 2000 $30,000 $16,430 Implemented
TN0274 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $227 $0 Implemented
TN0274 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $297 $500 Not Implemented
TN0274 # 02 Y:1986 02 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $366 $400 Not Implemented
TN0274 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $890 $0 Not Implemented
TN0244 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $396 $45 Implemented
TN0244 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $1,114 $1,600 Not Implemented
TN0244 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,989 $0 Implemented
TN0169 # 01 Y:1983 01 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,500 $50,000 Not Implemented
TN0169 # 03 Y:1983 03 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,500 $0 Not Implemented