Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 374 | Railroad Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0560 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,679 | $1,400 | Implemented |
WV0560 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,821 | $180 | Implemented |
WV0560 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,154 | $80 | Implemented |
WV0560 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,007 | $1,200 | Implemented |
WV0560 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,101 | $10,000 | Implemented |
WV0518 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $556 | $2,428 | Implemented |
WV0518 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,361 | $21,950 | Implemented |
WV0518 # 06 Y:2016 | 06 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $6,437 | $7,861 | Implemented |
WV0518 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,416 | $500 | Implemented |
WV0518 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,512 | $706 | Implemented |
WV0518 # 02 Y:2016 | 02 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,399 | $914 | Implemented |
WV0518 # 01 Y:2016 | 01 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $17,135 | $20,642 | Implemented |
WV0518 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $5,682 | $3,428 | Implemented |
WV0518 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $2,986 | $510 | Implemented |
WV0518 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,011 | $128 | Implemented |
WV0451 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,062 | $5,773 | Implemented |
WV0451 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,858 | $380 | Implemented |
WV0451 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $3,732 | $1,737 | Implemented |
WV0451 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,273 | $10,200 | Implemented |
WV0451 # 13 Y:2012 | 13 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,600 | $2,500 | Implemented |
WV0451 # 16 Y:2012 | 16 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $783 | $70 | Implemented |
WV0179 # 10 Y:1999 | 10 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $54,372 | $16,000 | Implemented |
WV0179 # 12 Y:1999 | 12 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $47 | $60 | Implemented |
WV0179 # 09 Y:1999 | 09 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $834 | $1,308 | Implemented |
WV0179 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $455 | $270 | Implemented |