Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
281
matching recommendationsSIC | 374 | Railroad Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0518 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,416 | $500 | Implemented |
WV0518 # 06 Y:2016 | 06 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $6,437 | $7,861 | Implemented |
BS0036 # 01 Y:2014 | 01 | 2014 | USE OPTIMUM THICKNESS INSULATION | $17,744 | $26,100 | Not Implemented |
BS0036 # 02 Y:2014 | 02 | 2014 | INSTALL REPLACEMENT DOORS | $4,556 | $17,436 | Not Implemented |
BS0036 # 03 Y:2014 | 03 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $16,582 | $31,134 | Not Implemented |
BS0036 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,961 | $10,130 | Not Implemented |
BS0036 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,898 | $2,032 | Implemented |
BS0036 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,963 | $937 | Implemented |
BS0036 # 05 Y:2014 | 05 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,250 | $11,371 | Not Implemented |
MZ0129 # 11 Y:2013 | 11 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,450 | $0 | Implemented |
MZ0129 # 10 Y:2013 | 10 | 2013 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,959 | $600 | Not Implemented |
MZ0129 # 09 Y:2013 | 09 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $31,162 | $150,000 | Not Implemented |
MZ0129 # 08 Y:2013 | 08 | 2013 | INSTALL OCCUPANCY SENSORS | $998 | $190 | Implemented |
MZ0129 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,580 | $267,500 | Implemented |
MZ0129 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156 | $0 | Not Implemented |
MZ0129 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,763 | $63,637 | Implemented |
MZ0129 # 04 Y:2013 | 04 | 2013 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,563 | $760 | Implemented |
MZ0129 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,082 | $1,800 | Implemented |
MZ0129 # 02 Y:2013 | 02 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $31,447 | $13,600 | Not Implemented |
MZ0129 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $56,550 | $18,200 | Implemented |
WV0451 # 02 Y:2012 | 02 | 2012 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $6,271 | $1,000 | Not Implemented |
WV0451 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,062 | $5,773 | Implemented |
WV0451 # 09 Y:2012 | 09 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,705 | $9,700 | Not Implemented |
WV0451 # 04 Y:2012 | 04 | 2012 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,597 | $27,000 | Not Implemented |
WV0451 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,273 | $10,200 | Implemented |