IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
SIC 374 Railroad Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0518 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,416 $500 Implemented
WV0518 # 06 Y:2016 06 2016 REPAIR OR REPLACE STEAM TRAPS $6,437 $7,861 Implemented
BS0036 # 01 Y:2014 01 2014 USE OPTIMUM THICKNESS INSULATION $17,744 $26,100 Not Implemented
BS0036 # 02 Y:2014 02 2014 INSTALL REPLACEMENT DOORS $4,556 $17,436 Not Implemented
BS0036 # 03 Y:2014 03 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $16,582 $31,134 Not Implemented
BS0036 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,961 $10,130 Not Implemented
BS0036 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,898 $2,032 Implemented
BS0036 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,963 $937 Implemented
BS0036 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,250 $11,371 Not Implemented
MZ0129 # 11 Y:2013 11 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,450 $0 Implemented
MZ0129 # 10 Y:2013 10 2013 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,959 $600 Not Implemented
MZ0129 # 09 Y:2013 09 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $31,162 $150,000 Not Implemented
MZ0129 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $998 $190 Implemented
MZ0129 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,580 $267,500 Implemented
MZ0129 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $0 Not Implemented
MZ0129 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,763 $63,637 Implemented
MZ0129 # 04 Y:2013 04 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,563 $760 Implemented
MZ0129 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,082 $1,800 Implemented
MZ0129 # 02 Y:2013 02 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $31,447 $13,600 Not Implemented
MZ0129 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $56,550 $18,200 Implemented
WV0451 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,271 $1,000 Not Implemented
WV0451 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $5,773 Implemented
WV0451 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,705 $9,700 Not Implemented
WV0451 # 04 Y:2012 04 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,597 $27,000 Not Implemented
WV0451 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,273 $10,200 Implemented