Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 3743 | Railroad Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0560 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,007 | $1,200 | Implemented |
WV0560 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,679 | $1,400 | Implemented |
WV0560 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,101 | $10,000 | Implemented |
WV0560 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,154 | $80 | Implemented |
WV0560 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,821 | $180 | Implemented |
WV0518 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $5,682 | $3,428 | Implemented |
WV0518 # 01 Y:2016 | 01 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $17,135 | $20,642 | Implemented |
WV0518 # 02 Y:2016 | 02 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,399 | $914 | Implemented |
WV0518 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,512 | $706 | Implemented |
WV0518 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,416 | $500 | Implemented |
WV0518 # 06 Y:2016 | 06 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $6,437 | $7,861 | Implemented |
WV0518 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,361 | $21,950 | Implemented |
WV0518 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $2,986 | $510 | Implemented |
WV0518 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,011 | $128 | Implemented |
WV0518 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $556 | $2,428 | Implemented |
WV0451 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,273 | $10,200 | Implemented |
WV0451 # 16 Y:2012 | 16 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $783 | $70 | Implemented |
WV0451 # 13 Y:2012 | 13 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,600 | $2,500 | Implemented |
WV0451 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $3,732 | $1,737 | Implemented |
WV0451 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,858 | $380 | Implemented |
WV0451 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,062 | $5,773 | Implemented |
WV0179 # 07 Y:1999 | 07 | 1999 | USE MINIMUM SAFE OVEN VENTILATION | $574 | $54 | Implemented |
WV0179 # 01 Y:1999 | 01 | 1999 | USE SYNTHETIC LUBRICANT | $163 | $312 | Implemented |
WV0179 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $200 | $174 | Implemented |
WV0179 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $455 | $270 | Implemented |