IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 375 Motorcycles, Bicycles, And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2214 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,351 $2,080 Not Implemented
UW2214 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $843 $970 Not Implemented
UW2214 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,014 $0 Not Implemented
IP0016 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,083 $0 Implemented
IP0016 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $421 $0 Not Implemented
IP0016 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $197 $0 Not Implemented
IP0016 # 04 Y:2013 04 2013 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $7,284 $1,400 Implemented
IP0016 # 05 Y:2013 05 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,008 $797 Not Implemented
IP0016 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,081 $21,876 Not Implemented
IP0016 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $708 $1,622 Not Implemented
IP0016 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $1,400 Implemented
IP0016 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $301 $490 Not Implemented
NC0472 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,563 $16,950 Implemented
NC0472 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $845 $1,125 Not Implemented
NC0472 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24 $0 Implemented
NC0472 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84 $200 Not Implemented
NC0472 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $50 Implemented
SD0392 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,246 $20,870 Not Implemented
SD0392 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,417 $17,500 Not Implemented
SD0392 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,991 $7,991 Not Implemented
SD0392 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,970 $0 Not Implemented
NC0338 # 06 Y:2006 06 2006 COVER OPEN TANKS $1,097 $1,600 Implemented
NC0338 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,416 $16,843 Implemented
NC0338 # 03 Y:2006 03 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,391 $2,500 Implemented
NC0338 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $54,759 $18,800 Not Implemented