Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
145
matching recommendationsSIC | 376 | Guided Missiles, Space Vehicles, Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0276 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $398 | $478 | Not Implemented |
UU0054 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $170 | $698 | n/a |
UU0054 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $185 | $130 | n/a |
UU0054 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,707 | $0 | n/a |
UU0054 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $1,487 | $720 | n/a |
UU0054 # 05 Y:2003 | 05 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,909 | $3,500 | n/a |
UU0054 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $868 | $10,415 | n/a |
UU0054 # 07 Y:2003 | 07 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,752 | $0 | n/a |
UU0051 # 01 Y:2003 | 01 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,232 | $0 | Not Implemented |
UU0051 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $744 | $340 | Not Implemented |
UU0051 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,845 | $961 | Not Implemented |
UU0051 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,130 | $11,800 | Not Implemented |
UU0051 # 05 Y:2003 | 05 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,823 | $0 | Not Implemented |
UU0051 # 06 Y:2003 | 06 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,510 | $5,980 | Not Implemented |
UU0051 # 07 Y:2003 | 07 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,270 | $8,450 | Not Implemented |
TA0016 # 01 Y:2001 | 01 | 2001 | REPLACE BOILER | $420,482 | $9,456 | Implemented |
TA0016 # 02 Y:2001 | 02 | 2001 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,055 | $600 | Implemented |
TA0016 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $13,585 | $2,910 | Implemented |
TA0016 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,090 | $1,200 | Implemented |
TA0016 # 05 Y:2001 | 05 | 2001 | COVER OPEN TANKS | $2,000 | $3,900 | Not Implemented |
TA0016 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,920 | $54 | Implemented |
TA0016 # 07 Y:2001 | 07 | 2001 | USE PHOTOCELL CONTROLS | $1,696 | $225 | Implemented |
TA0016 # 08 Y:2001 | 08 | 2001 | USE SYNTHETIC LUBRICANT | $1,600 | $0 | Not Implemented |
TA0016 # 09 Y:2001 | 09 | 2001 | INSTALL OCCUPANCY SENSORS | $1,032 | $320 | Implemented |
TA0016 # 10 Y:2001 | 10 | 2001 | DISCONNECT BALLASTS | $510 | $982 | Not Implemented |