IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
SIC 376 Guided Missiles, Space Vehicles, Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0276 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $478 Not Implemented
UU0054 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $170 $698 n/a
UU0054 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $185 $130 n/a
UU0054 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,707 $0 n/a
UU0054 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $1,487 $720 n/a
UU0054 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,909 $3,500 n/a
UU0054 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $10,415 n/a
UU0054 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,752 $0 n/a
UU0051 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,232 $0 Not Implemented
UU0051 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $340 Not Implemented
UU0051 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,845 $961 Not Implemented
UU0051 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,130 $11,800 Not Implemented
UU0051 # 05 Y:2003 05 2003 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,823 $0 Not Implemented
UU0051 # 06 Y:2003 06 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,510 $5,980 Not Implemented
UU0051 # 07 Y:2003 07 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,270 $8,450 Not Implemented
TA0016 # 01 Y:2001 01 2001 REPLACE BOILER $420,482 $9,456 Implemented
TA0016 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,055 $600 Implemented
TA0016 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $13,585 $2,910 Implemented
TA0016 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,090 $1,200 Implemented
TA0016 # 05 Y:2001 05 2001 COVER OPEN TANKS $2,000 $3,900 Not Implemented
TA0016 # 06 Y:2001 06 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,920 $54 Implemented
TA0016 # 07 Y:2001 07 2001 USE PHOTOCELL CONTROLS $1,696 $225 Implemented
TA0016 # 08 Y:2001 08 2001 USE SYNTHETIC LUBRICANT $1,600 $0 Not Implemented
TA0016 # 09 Y:2001 09 2001 INSTALL OCCUPANCY SENSORS $1,032 $320 Implemented
TA0016 # 10 Y:2001 10 2001 DISCONNECT BALLASTS $510 $982 Not Implemented