Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 3769 Space Vehicle Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0319 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $876 $500 Not Implemented
BD0319 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,538 $875 Implemented
BD0319 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $1,153 $2,800 Not Implemented
BD0319 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $475 Not Implemented
BD0319 # 03 Y:2007 03 2007 USE PHOTOCELL CONTROLS $328 $250 Not Implemented
BD0319 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,763 $0 Implemented
LM0102 # 05 Y:2005 05 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,258,000 $1,250,000 Implemented
LM0102 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,202 $500 Implemented
LM0102 # 04 Y:2005 04 2005 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $450,000 $15,000 Not Implemented
LM0102 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $1,000 Implemented
LM0102 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,712 $200 Implemented
MS0276 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $64,043 $8,505 Not Implemented
MS0276 # 06 Y:2005 06 2005 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,712 $1,848 Not Implemented
MS0276 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,158 $1,871 Implemented
MS0276 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $478 Not Implemented
MS0276 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $32,940 $298 Not Implemented
MS0276 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,566 $20,159 Implemented
MS0276 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,492 $8,838 Not Implemented
MS0276 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,547 $15,656 Not Implemented
TA0016 # 06 Y:2001 06 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,920 $54 Implemented
TA0016 # 05 Y:2001 05 2001 COVER OPEN TANKS $2,000 $3,900 Not Implemented
TA0016 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,090 $1,200 Implemented
TA0016 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $13,585 $2,910 Implemented
TA0016 # 11 Y:2001 11 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $254 $542 Implemented
TA0016 # 01 Y:2001 01 2001 REPLACE BOILER $420,482 $9,456 Implemented