Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 3769 | Space Vehicle Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0016 # 10 Y:2001 | 10 | 2001 | DISCONNECT BALLASTS | $510 | $982 | Not Implemented |
TA0016 # 02 Y:2001 | 02 | 2001 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,055 | $600 | Implemented |
TA0016 # 08 Y:2001 | 08 | 2001 | USE SYNTHETIC LUBRICANT | $1,600 | $0 | Not Implemented |
TA0016 # 01 Y:2001 | 01 | 2001 | REPLACE BOILER | $420,482 | $9,456 | Implemented |
TA0016 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,920 | $54 | Implemented |
SF0194 # 02 Y:2000 | 02 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,898 | $3,720 | Implemented |
SF0194 # 01 Y:2000 | 01 | 2000 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $25,387 | $11,668 | Not Implemented |
SF0194 # 03 Y:2000 | 03 | 2000 | COVER OPEN TANKS | $550 | $746 | Implemented |
SF0194 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,052 | $0 | Implemented |
SF0194 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,331 | $57,900 | Implemented |
AS0144 # 02 Y:1995 | 02 | 1995 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $22,768 | $58,000 | Not Implemented |
AS0144 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,451 | $5,634 | Implemented |
AS0144 # 04 Y:1995 | 04 | 1995 | USE SYNTHETIC LUBRICANT | $1,119 | $1,380 | Implemented |
AS0144 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $704 | $0 | Implemented |
AS0144 # 06 Y:1995 | 06 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $358 | $1,305 | Implemented |
AS0144 # 01 Y:1995 | 01 | 1995 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $42,045 | $63,900 | Implemented |
AS0068 # 05 Y:1992 | 05 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,167 | $45,000 | Not Implemented |
AS0068 # 06 Y:1992 | 06 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,648 | $25,404 | Not Implemented |
AS0068 # 07 Y:1992 | 07 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $565 | $4,799 | Not Implemented |
AS0068 # 08 Y:1992 | 08 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $900 | Not Implemented |
AS0068 # 04 Y:1992 | 04 | 1992 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,332 | $0 | Not Implemented |
AS0068 # 01 Y:1992 | 01 | 1992 | KEEP LAMPS AND REFLECTORS CLEAN | $39,436 | $109,150 | Not Implemented |
AS0068 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,461 | $26,270 | Not Implemented |
AS0068 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,863 | $1,536 | Not Implemented |
AS0022 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,472 | $1,100 | Implemented |