IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 3799 Transportation Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0015 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,962 $1,500 Implemented
IC0015 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,503 $92,040 n/a
IC0015 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $522 $1,677 Implemented
IC0015 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,569 $7,461 Implemented
IC0015 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,359 $2,516 Implemented
IC0015 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $369 $1,551 Not Implemented
IC0015 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $222 $832 Implemented
IC0015 # 13 Y:2001 13 2001 $484,000 $66,100 Not Implemented
IC0015 # 12 Y:2001 12 2001 $84,800 $6,670 Not Implemented
IC0015 # 11 Y:2001 11 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $28,000 $5,300 Implemented
IC0015 # 10 Y:2001 10 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $162 $0 Implemented
IC0015 # 09 Y:2001 09 2001 INSULATE BARE EQUIPMENT $128 $370 Not Implemented
IC0015 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $652 $2,670 Not Implemented
GT0678 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,880 $3,500 Not Implemented
GT0678 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $7,560 $7,500 Not Implemented
GT0678 # 01 Y:1999 01 1999 METER WASTE WATER $4,925 $900 Implemented
GT0678 # 02 Y:1999 02 1999 REDUCE EXCESSIVE BOILER BLOWDOWN $920 $900 Not Implemented
GT0678 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,400 $0 Not Implemented
GT0678 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $35,980 $0 Implemented
GT0678 # 07 Y:1999 07 1999 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,185 $120,000 Not Implemented
GT0678 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,447 $21,000 Not Implemented
IA0230 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $847 $1,105 Implemented
IA0230 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,152 $257 Implemented
IA0230 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $387 $798 Not Implemented
IA0230 # 09 Y:1999 09 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $16,258 $7,853 Not Implemented