IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,845

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0589 # 10 Y:2023 10 2023 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $5,304 $4,300 Implemented
UF0589 # 11 Y:2023 11 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,770 $2,800 Implemented
UF0589 # 12 Y:2023 12 2023 INSTALL TURBULATORS $4,595 $7,500 Implemented
UF0589 # 13 Y:2023 13 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $4,532 $754 Implemented
UF0589 # 14 Y:2023 14 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,316 $3,069 Implemented
UF0589 # 15 Y:2023 15 2023 INSTALL OCCUPANCY SENSORS $2,868 $9,968 Implemented
UF0589 # 16 Y:2023 16 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,322 $0 Implemented
UF0589 # 17 Y:2023 17 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $88,974 $10,000 Implemented
UU0215 # 02 Y:2023 02 2023 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,878 $48,510 Implemented
UU0215 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,368 $27,177 Implemented
UU0215 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,775 $52,882 Implemented
UU0215 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $3,212 $5,850 Implemented
UU0215 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,565 $1,563 Implemented
UU0215 # 07 Y:2023 07 2023 REDESIGN PROCESS $913 $2,360 Implemented
UU0215 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $228 $1,725 Implemented
MZ0339 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $536 $1,120 Implemented
MZ0339 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,100 $8,100 Implemented
MI0416 # 08 Y:2022 08 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,431 $280 Implemented
MI0416 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,973 $2,100 Implemented
MI0416 # 06 Y:2022 06 2022 PAY UTILITY BILLS ON TIME $6,239 $0 Implemented
MI0416 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,879 $2,399 Implemented
MI0416 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,652 $480 Implemented
MI0416 # 03 Y:2022 03 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $10,295 $0 Implemented
MI0416 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,412 $20,515 Implemented
MI0416 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,300 $580 Implemented