IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0650 # 03 Y:2020 03 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,430 $997 Implemented
NC0650 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,107 $210 Not Implemented
NC0650 # 02 Y:2020 02 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,080 $500 Not Implemented
NC0650 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,314 $20,000 Implemented
NC0650 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,730 $1,200 Implemented
NC0650 # 05 Y:2020 05 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $955 $2,350 Implemented
NC0650 # 04 Y:2020 04 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,651 $8,000 Not Implemented
NC0573 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,606 $76,556 Implemented
NC0573 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $618 $160 Not Implemented
NC0573 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $105 $200 Implemented
NC0573 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,685 $13,453 Implemented
NC0573 # 01 Y:2016 01 2016 CHECK FOR ACCURACY OF UTILITY / POWER METERS $2,610 $100 Not Implemented
NC0573 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $219 $100 Implemented
NC0573 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $418 $75 Not Implemented
NC0475 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $1,124 Not Implemented
NC0475 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,801 $48,075 Not Implemented
NC0475 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,988 $4,750 Not Implemented
NC0475 # 06 Y:2013 06 2013 REDUCE FLUID FLOW RATES $16,217 $25,000 Not Implemented
NC0475 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $100 Not Implemented
NC0475 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $9,597 $5,600 Not Implemented
NC0387 # 03 Y:2009 03 2009 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $44,613 $45,000 Not Implemented
NC0387 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $351 Not Implemented
NC0387 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,156 $85,555 Implemented
NC0387 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $2,019 $2,198 Not Implemented
NC0387 # 04 Y:2009 04 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,000 $25,000 Not Implemented