IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0194 # 05 Y:2000 05 2000 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,846 $20,200 Implemented
CO0466 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,420 $10,000 Implemented
CO0466 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,120 $0 Not Implemented
CO0466 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $540 $870 Not Implemented
CO0466 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $470 $1,000 Implemented
CO0466 # 05 Y:2000 05 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $220 $280 Not Implemented
CO0466 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $640 $0 Implemented
CO0466 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $1,030 $320 Implemented
CO0466 # 08 Y:2000 08 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $50,740 $40,000 Implemented
IA0240 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,330 $0 Implemented
IA0240 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,222 $0 Implemented
IA0240 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,996 $463 Implemented
IA0240 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,204 $100 Implemented
IA0240 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,648 $623 Implemented
WI0367 # 01 Y:2000 01 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $57,375 $0 n/a
WI0367 # 02 Y:2000 02 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,201 $0 n/a
WI0367 # 03 Y:2000 03 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,036 $9,000 n/a
WI0367 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $7,036 $800 n/a
WI0367 # 05 Y:2000 05 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,226 $0 n/a
WI0367 # 06 Y:2000 06 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,882 $5,500 n/a
WI0367 # 07 Y:2000 07 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,657 $0 n/a
WI0367 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $2,436 $0 n/a
WI0367 # 09 Y:2000 09 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $928 $1,092 n/a
WI0367 # 10 Y:2000 10 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $150 $640 n/a
GT0684 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,160 $0 Not Implemented