Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,210
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0652 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,430 | $130,994 | n/a |
GT0652 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,300 | $0 | n/a |
GT0652 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,000 | $250 | n/a |
GT0652 # 04 Y:1998 | 04 | 1998 | UTILIZE OUTSIDE CONTRACTING | $4,345 | $0 | n/a |
GT0652 # 01 Y:1998 | 01 | 1998 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $9,935 | $0 | n/a |
IA0210 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,138 | $17,423 | Implemented |
IA0210 # 02 Y:1998 | 02 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,040 | $12,186 | Not Implemented |
IA0210 # 03 Y:1998 | 03 | 1998 | INSTALL OCCUPANCY SENSORS | $2,457 | $2,793 | Implemented |
IA0210 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,766 | $4,820 | Implemented |
IA0210 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $134 | $282 | Implemented |
IA0210 # 06 Y:1998 | 06 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $261,385 | $19,800 | Not Implemented |
IA0210 # 07 Y:1998 | 07 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $2,824 | $10,101 | Not Implemented |
NC0151 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,157 | $600 | Not Implemented |
NC0151 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $33,411 | $132,700 | Not Implemented |
NC0151 # 03 Y:1998 | 03 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $401 | $1,500 | Not Implemented |
NC0151 # 04 Y:1998 | 04 | 1998 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $700 | $2,100 | Not Implemented |
NC0151 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,290 | $3,000 | Not Implemented |
NC0151 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,822 | $15,000 | Not Implemented |
NC0151 # 07 Y:1998 | 07 | 1998 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $11,500 | $45,000 | Not Implemented |
NC0151 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,721 | $16,000 | Not Implemented |
AS0234 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $324 | $525 | Not Implemented |
AS0234 # 02 Y:1998 | 02 | 1998 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,398 | $4,425 | Not Implemented |
AS0234 # 03 Y:1998 | 03 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,384 | $60 | Implemented |
AS0234 # 04 Y:1998 | 04 | 1998 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $132,000 | $48,000 | Implemented |
AS0234 # 05 Y:1998 | 05 | 1998 | APPLY FOR INVESTMENT INCENTIVES | $900 | $60 | Not Implemented |