Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,140
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0854 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,399 | $3,125 | Implemented |
UF0589 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $920,434 | $2,793,000 | Implemented |
UF0589 # 02 Y:2023 | 02 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $505,092 | $2,115,660 | Implemented |
UF0589 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $130,403 | $95,736 | Not Implemented |
UF0589 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $71,810 | $25,340 | Implemented |
UF0589 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,787 | $43,077 | Implemented |
UF0589 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $18,200 | $14,400 | Implemented |
UF0589 # 07 Y:2023 | 07 | 2023 | CLEAN CONDENSER TUBES | $15,589 | $0 | Implemented |
UF0589 # 08 Y:2023 | 08 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $13,274 | $30,000 | Implemented |
UF0589 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,438 | $0 | Implemented |
UF0589 # 10 Y:2023 | 10 | 2023 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $5,304 | $4,300 | Implemented |
UF0589 # 11 Y:2023 | 11 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,770 | $2,800 | Implemented |
UF0589 # 12 Y:2023 | 12 | 2023 | INSTALL TURBULATORS | $4,595 | $7,500 | Implemented |
UF0589 # 13 Y:2023 | 13 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $4,532 | $754 | Implemented |
UF0589 # 14 Y:2023 | 14 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,316 | $3,069 | Implemented |
UF0589 # 15 Y:2023 | 15 | 2023 | INSTALL OCCUPANCY SENSORS | $2,868 | $9,968 | Implemented |
UF0589 # 16 Y:2023 | 16 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,322 | $0 | Implemented |
UF0589 # 17 Y:2023 | 17 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $88,974 | $10,000 | Implemented |
UU0215 # 01 Y:2023 | 01 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,760 | $120,564 | Not Implemented |
UU0215 # 02 Y:2023 | 02 | 2023 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $4,878 | $48,510 | Implemented |
UU0215 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,368 | $27,177 | Implemented |
UU0215 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,775 | $52,882 | Implemented |
UU0215 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,212 | $5,850 | Implemented |
UU0215 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,565 | $1,563 | Implemented |
UU0215 # 07 Y:2023 | 07 | 2023 | REDESIGN PROCESS | $913 | $2,360 | Implemented |