Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
493
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0287 # 08 Y:2001 | 08 | 2001 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $39,000 | $5,247 | Implemented |
UF0287 # 09 Y:2001 | 09 | 2001 | PAY UTILITY BILLS ON TIME | $15,147 | $0 | Not Implemented |
UF0287 # 10 Y:2001 | 10 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $29,250 | $3,000 | Implemented |
MI0024 # 01 Y:2001 | 01 | 2001 | ISOLATE HOT OR COLD EQUIPMENT | $156,000 | $10,000 | n/a |
MI0024 # 02 Y:2001 | 02 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,590 | $7 | n/a |
MI0024 # 03 Y:2001 | 03 | 2001 | ADD AREA LIGHTING SWITCHES | $2,108 | $1,000 | n/a |
MI0024 # 04 Y:2001 | 04 | 2001 | ADD AREA LIGHTING SWITCHES | $1,333 | $700 | n/a |
MI0024 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $200 | $2 | n/a |
MI0002 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,063 | $414 | Not Implemented |
MI0002 # 02 Y:2001 | 02 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $22,409 | $6,500 | Not Implemented |
MI0002 # 03 Y:2001 | 03 | 2001 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $30,943 | $20 | Not Implemented |
MI0002 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $47,000 | $300 | Not Implemented |
MI0002 # 05 Y:2001 | 05 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,034 | $3,531 | Not Implemented |
MI0002 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,800 | $35 | Not Implemented |
MI0002 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,119 | $690 | Not Implemented |
MI0002 # 08 Y:2001 | 08 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,409 | $20 | Not Implemented |
MI0002 # 09 Y:2001 | 09 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $94,000 | $33,124 | Not Implemented |
UF0259 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,865 | $2,831 | Implemented |
UF0259 # 02 Y:2000 | 02 | 2000 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,242 | $12,014 | Not Implemented |
UF0259 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,732 | $7,400 | Implemented |
UF0259 # 04 Y:2000 | 04 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,323 | $50 | Implemented |
UF0259 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,597 | $460 | Implemented |
UF0259 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,740 | $0 | Implemented |
UF0259 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $835 | $1,500 | Not Implemented |
UF0259 # 08 Y:2000 | 08 | 2000 | INSTALL OCCUPANCY SENSORS | $481 | $834 | Implemented |