IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0352 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $160 Not Implemented
MI0352 # 12 Y:2019 12 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $518 $2,294 Implemented
MI0342 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $56,921 $3,280 Implemented
MI0342 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $48,793 $800 Implemented
MI0342 # 03 Y:2018 03 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,500 $15,000 Implemented
MI0342 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,291 $14,298 Implemented
MI0342 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $4,165 Implemented
MI0342 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $3,475 $14,430 Not Implemented
MI0342 # 07 Y:2018 07 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $770 $80 Implemented
MI0324 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $94,097 $134,000 Not Implemented
MI0324 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,637 $15,056 Implemented
MI0324 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $28,032 $41,300 Implemented
MI0324 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,387 $8,923 Implemented
MI0324 # 05 Y:2017 05 2017 COMBINE UTILITY METERS $7,245 $100 Not Implemented
MI0324 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,467 $4,900 Implemented
MI0324 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,663 $1,478 Implemented
MI0324 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $3,528 $1,000 Implemented
MI0324 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,760 $250 Not Implemented
MI0324 # 10 Y:2017 10 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,051 $1,722 Implemented
MI0324 # 11 Y:2017 11 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $670 $100 Not Implemented
MI0315 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,269 $1,660 Implemented
MI0315 # 02 Y:2017 02 2017 REPLACE BOILER $28,850 $36,000 Implemented
MI0315 # 03 Y:2017 03 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,532 $1,560 Not Implemented
MI0315 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,687 $960 Implemented
MI0315 # 05 Y:2017 05 2017 USE OPTIMUM THICKNESS INSULATION $10,994 $1,320 Not Implemented