IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0315 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $9,833 $434 Implemented
MI0315 # 07 Y:2017 07 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,476 $6,800 Implemented
MI0315 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,093 $5,340 Implemented
MI0254 # 01 Y:2014 01 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $66,980 $10,999 Implemented
MI0254 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,927 $80 Implemented
MI0254 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $17,716 $3,100 Implemented
MI0254 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,333 $7,040 Not Implemented
MI0254 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,159 $2,206 Not Implemented
MI0254 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $5,083 $7,680 Implemented
MI0254 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $2,160 Implemented
MI0254 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,949 $13,170 Implemented
MI0254 # 09 Y:2014 09 2014 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,341 $600 Not Implemented
MI0254 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $3,162 $800 Implemented
MI0254 # 11 Y:2014 11 2014 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,914 $520 Not Implemented
MI0254 # 12 Y:2014 12 2014 PAY BILLS ON TIME TO AVOID LATE FEES $1,523 $240 Implemented
MI0254 # 13 Y:2014 13 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $1,660 Implemented
MI0254 # 14 Y:2014 14 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $447 $80 Implemented
MI0233 # 01 Y:2012 01 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $246,388 $33,021 Implemented
MI0233 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $150,126 $80 Implemented
MI0233 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $44,157 $11,632 Not Implemented
MI0233 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,400 $1,660 Implemented
MI0233 # 05 Y:2012 05 2012 OPTIMIZE PLANT POWER FACTOR $10,216 $11,120 Not Implemented
MI0233 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,406 $1,060 Not Implemented
MI0233 # 07 Y:2012 07 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,508 $5,069 Not Implemented
MI0233 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,430 $2,665 Implemented