IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0430 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $180 $0 Implemented
TA0020 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,175 $26,460 n/a
TA0020 # 02 Y:2001 02 2001 PAY BILLS ON TIME TO AVOID LATE FEES $4,751 $0 Implemented
TA0020 # 03 Y:2001 03 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,260 $240 Implemented
TA0020 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,415 $1,715 Implemented
TA0020 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,110 $321 Implemented
TA0020 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $685 $140 Implemented
TA0020 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $584 $320 Implemented
TA0020 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $370 $160 Implemented
AM0299 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,000 $80,500 Implemented
AM0299 # 02 Y:1997 02 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $17,850 $16,760 Implemented
AM0299 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,500 $29,520 Implemented
AM0299 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,700 $8,000 Implemented
AM0299 # 05 Y:1997 05 1997 ADD AREA LIGHTING SWITCHES $2,070 $560 Implemented
AM0299 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,860 $0 Not Implemented
AM0299 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $1,140 Not Implemented
AM0299 # 08 Y:1997 08 1997 USE SYNTHETIC LUBRICANT $520 $0 Implemented
AM0299 # 09 Y:1997 09 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $200 Implemented
KG0084 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,940 $0 n/a
KG0084 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,366 $1,022 n/a
KG0084 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,635 $6,140 n/a
KG0084 # 04 Y:1997 04 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $33,600 $12,995 n/a
KG0084 # 05 Y:1997 05 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $22,469 $7,757 n/a
KG0084 # 06 Y:1997 06 1997 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $800,000 $0 n/a
KG0083 # 01 Y:1997 01 1997 LOWER CEILING TO REDUCE CONDITIONED SPACE $3,168 $400 n/a