IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2001 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,200 $61,410 Implemented
CL2001 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $584,752 $499,000 Not Implemented
CL2001 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,354 $0 Implemented
CL2001 # 04 Y:2020 04 2020 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $350 $0 Not Implemented
CL1905 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $918 $2,080 Implemented
CL1905 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,441 $0 Implemented
CL1905 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,586 $1,600 Implemented
CL1905 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $139 $900 Implemented
CL1905 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,489 $13,085 Implemented
CL1905 # 01 Y:2019 01 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,261 $6,500 Implemented
TN0366 # 11 Y:1989 11 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $259 $270 Not Implemented
TN0366 # 10 Y:1989 10 1989 INSULATE BARE EQUIPMENT $123 $50 Implemented
TN0366 # 09 Y:1989 09 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,404 $4,000 Implemented
TN0366 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $556 $0 Implemented
TN0366 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $959 $1,960 Not Implemented
TN0366 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,977 $330 Implemented
TN0366 # 05 Y:1989 05 1989 INCREASE AMOUNT OF CONDENSATE RETURNED $1,712 $4,156 Implemented
TN0366 # 04 Y:1989 04 1989 KEEP LAMPS AND REFLECTORS CLEAN $10,766 $33,188 Not Implemented
TN0366 # 03 Y:1989 03 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $2,450 $718 Implemented
TN0366 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $4,213 $720 Implemented
TN0366 # 01 Y:1989 01 1989 USE MINIMUM STEAM OPERATING PRESSURE $4,924 $0 Implemented