IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0231 # 01 Y:2023 01 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,636 $127,500 n/a
UU0231 # 03 Y:2023 03 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $6,518 $19,160 n/a
UU0231 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,519 $14,890 n/a
UU0231 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,898 $263,547 n/a
UU0231 # 04 Y:2023 04 2023 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,026 $30,128 n/a
UU0215 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $228 $1,725 Implemented
UU0215 # 07 Y:2023 07 2023 REDESIGN PROCESS $913 $2,360 Implemented
UU0215 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,565 $1,563 Implemented
UU0215 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $3,212 $5,850 Implemented
UU0215 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,775 $52,882 Implemented
UU0215 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,368 $27,177 Implemented
UU0215 # 02 Y:2023 02 2023 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,878 $48,510 Implemented
UU0215 # 01 Y:2023 01 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $13,760 $120,564 Not Implemented
UU0209 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,279 $1,600 Implemented
UU0209 # 05 Y:2022 05 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,347 $1,395 Implemented
UU0209 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $900 Implemented
UU0209 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,767 $6,406 Not Implemented
UU0209 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,247 $850 Not Implemented
UU0209 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,206 $5,920 Implemented
UU0209 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,593 $20,930 Not Implemented
UU0201 # 02 Y:2022 02 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,352 $8,000 Implemented
UU0201 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,786 $1,000 Implemented
UU0201 # 06 Y:2022 06 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $307 $329 Not Implemented
UU0201 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $771 $1,550 Not Implemented
UU0201 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $19,186 $1,125 Implemented