IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0078 # 02 Y:2015 02 2015 USE SYNTHETIC LUBRICANT $14,981 $4,505 Not Implemented
WM0078 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $31,723 $105,982 Not Implemented
WM0078 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $1,006 $1,500 Not Implemented
WM0078 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,156 $300 Not Implemented
WM0078 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,824 $1,300 Not Implemented
WM0078 # 09 Y:2015 09 2015 USE PHOTOCELL CONTROLS $2,082 $2,816 Not Implemented
WM0078 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,724 $2,584 Not Implemented
WM0078 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,708 $400 Not Implemented
WM0078 # 06 Y:2015 06 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,749 $8,000 Not Implemented
WM0078 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,459 $11,985 Not Implemented
WM0078 # 04 Y:2015 04 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,083 $3,000 Not Implemented
WM0078 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $11,162 $18,000 Not Implemented
WM0022 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $2,744 $2,303 Implemented
WM0022 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,779 $6,480 Implemented
WM0022 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $12,280 $30,697 Not Implemented
IC0166 # 07 Y:2009 07 2009 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $3,264 $16,200 Not Implemented
IC0166 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $134 $0 Implemented
IC0166 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $84 $345 Implemented
IC0166 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,442 $1,720 Not Implemented
IC0166 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $136 Not Implemented
IC0166 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,135 $4,045 Not Implemented
IC0166 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,511 $10,994 Implemented
IC0166 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $659 $0 Not Implemented
WI0503 # 01 Y:2005 01 2005 $47,772 $9,625 Not Implemented
WI0503 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,209 $21,960 Not Implemented