IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0070 # 05 Y:1996 05 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,684 $2,310 Implemented
DS0070 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $181 $0 Implemented
DS0070 # 03 Y:1996 03 1996 RECOVER AND REUSE WASTE MATERIAL $544 $0 Not Implemented
DS0070 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,725 $11,774 Not Implemented
DS0070 # 01 Y:1996 01 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,276 $4,750 Not Implemented
UD0497 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,760 $13,724 Implemented
UD0497 # 02 Y:1996 02 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,460 $300 Not Implemented
UD0497 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,035 $20,230 Implemented
UD0497 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,514 $1,500 Not Implemented
DS0058 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $164 $100 Not Implemented
DS0058 # 06 Y:1996 06 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,885 $1,050 Implemented
DS0058 # 05 Y:1996 05 1996 TREAT AND REUSE RINSE WATERS $733 $380 Not Implemented
DS0058 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,728 $300 Implemented
DS0058 # 02 Y:1996 02 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $638 $175 Implemented
DS0058 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $859 $859 Implemented
TN0588 # 05 Y:1996 05 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $545 $0 Not Implemented
SD0154 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $3,032 $1,127 Implemented
SD0154 # 09 Y:1996 09 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,250 $4,000 Implemented
SD0154 # 08 Y:1996 08 1996 REPROCESS SPENT OILS ON SITE FOR RE-USE $9,000 $6,000 Implemented
TN0588 # 02 Y:1996 02 1996 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $14,500 $13,000 Not Implemented
TN0588 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,760 $5,300 Implemented
TN0588 # 01 Y:1996 01 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $45,192 $51,320 Implemented
SD0154 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $400 Implemented
SD0154 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,750 $40 Implemented
SD0154 # 03 Y:1996 03 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,082 $8,500 Implemented