IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 381 Search And Navigation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0118 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,082 $10,080 Implemented
UM0118 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $523 $900 Implemented
AM0299 # 09 Y:1997 09 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $200 Implemented
AM0299 # 08 Y:1997 08 1997 USE SYNTHETIC LUBRICANT $520 $0 Implemented
AM0299 # 05 Y:1997 05 1997 ADD AREA LIGHTING SWITCHES $2,070 $560 Implemented
AM0299 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,700 $8,000 Implemented
AM0299 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,500 $29,520 Implemented
AM0299 # 02 Y:1997 02 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $17,850 $16,760 Implemented
AM0299 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,000 $80,500 Implemented
MS0050 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,300 $0 Implemented
MS0050 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,370 $1,882 Implemented
CO0343 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $900 Implemented
CO0343 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $2,680 Implemented
CO0343 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $930 $1,250 Implemented
WV0055 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $500 Implemented
WV0055 # 07 Y:1995 07 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,650 $3,780 Implemented
WV0055 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $589 $760 Implemented
WV0055 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $768 $374 Implemented
WV0055 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $1,558 Implemented
KU0441 # 10 Y:1994 10 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $272 $150 Implemented
KU0441 # 09 Y:1994 09 1994 USE SYNTHETIC LUBRICANT $303 $510 Implemented
KU0441 # 07 Y:1994 07 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,698 $700 Implemented
KU0441 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,871 $2,862 Implemented
KU0441 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $21,533 $0 Implemented
KU0441 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,997 $73,718 Implemented