Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
761
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0261 # 08 Y:2007 | 08 | 2007 | REDUCE VENTILATION AIR | $12,057 | $13,919 | Implemented |
SU0261 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,800 | $5,887 | Implemented |
SU0261 # 11 Y:2007 | 11 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $40 | $153 | Implemented |
SU0261 # 12 Y:2007 | 12 | 2007 | INSTALL OCCUPANCY SENSORS | $368 | $1,801 | Implemented |
SU0261 # 13 Y:2007 | 13 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,169 | $135,500 | Implemented |
SF0331 # 01 Y:2006 | 01 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,466 | $169 | Implemented |
SF0331 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,440 | $3,828 | Implemented |
SF0331 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,535 | $4,389 | Implemented |
SF0331 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $371 | $888 | Implemented |
LE0234 # 01 Y:2006 | 01 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $190,924 | $500,000 | Implemented |
LE0234 # 02 Y:2006 | 02 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $46,545 | $3,000 | Implemented |
LE0234 # 05 Y:2006 | 05 | 2006 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $10,090 | $6,000 | Implemented |
LE0234 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $5,320 | $1,500 | Implemented |
LE0234 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,195 | $3,490 | Implemented |
LE0234 # 08 Y:2006 | 08 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $593 | $60 | Implemented |
MA0576 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,240 | $3,120 | Implemented |
MA0576 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,578 | $7,342 | Implemented |
MA0576 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,505 | $4,283 | Implemented |
LE0210 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,088 | $750 | Implemented |
LE0210 # 03 Y:2005 | 03 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,616 | $2,000 | Implemented |
LE0210 # 04 Y:2005 | 04 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,330 | $4,866 | Implemented |
LE0210 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $255 | $80 | Implemented |
UD0713 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,435 | $41,783 | Implemented |
UD0713 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,925 | $200 | Implemented |
UD0713 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,021 | $3,807 | Implemented |