IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

761

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0070 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $175 $250 Implemented
AM0070 # 05 Y:1989 05 1989 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $120 $0 Implemented
TN0374 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,618 $3,660 Implemented
TN0374 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,973 $840 Implemented
TN0374 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $2,011 $600 Implemented
TN0374 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $813 $1,250 Implemented
TN0374 # 08 Y:1989 08 1989 INSTALL SET-BACK TIMERS $675 $0 Implemented
TN0374 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $608 $366 Implemented
UD0272 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $2,010 $0 Implemented
UD0272 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,495 $278 Implemented
RU0033 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,608 $302 Implemented
RU0033 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,137 $0 Implemented
RU0033 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,749 $0 Implemented
RU0033 # 06 Y:1988 06 1988 REDESIGN PROCESS $7,218 $24,000 Implemented
RU0033 # 07 Y:1988 07 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,018 $2,500 Implemented
RU0033 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $4,132 $402 Implemented
RU0033 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $244 Implemented
CO0124 # 01 Y:1988 01 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $834 $300 Implemented
CO0124 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,162 $0 Implemented
CO0124 # 03 Y:1988 03 1988 AIR CONDITION ONLY SPACE NECESSARY $1,645 $1,000 Implemented
CO0124 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,150 $1,200 Implemented
CO0124 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $881 $969 Implemented
AT0100 # 02 Y:1988 02 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,734 $8,672 Implemented
AT0100 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $192 $286 Implemented
AT0100 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $259 $0 Implemented