IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

276

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0644 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $1,016 Not Implemented
SD0644 # 06 Y:2024 06 2024 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $61,738 $0 Not Implemented
SD0644 # 01 Y:2024 01 2024 USE PHOTOCELL CONTROLS $693 $1,890 Not Implemented
SD0644 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $240 Not Implemented
SD0644 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,342 $141,268 Not Implemented
SD0644 # 04 Y:2024 04 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $3,868 $8,200 Not Implemented
SD0644 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $5,961 $1,050 Not Implemented
SD0644 # 09 Y:2024 09 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $738 $3,205 Not Implemented
SD0644 # 08 Y:2024 08 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $7,472 $0 Not Implemented
SD0619 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,059 $4,547 Implemented
SD0619 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,715 $4,000 Not Implemented
SD0619 # 03 Y:2021 03 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $83,606 $387,000 Not Implemented
SD0554 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $30,343 $65,600 Implemented
SD0554 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $200 Implemented
SD0554 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $274 $1,300 Implemented
SD0554 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $1,450 Implemented
SD0554 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,849 $4,785 Not Implemented
SD0554 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,421 $15,275 Implemented
SD0554 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,214 $2,470 Not Implemented
SD0549 # 01 Y:2017 01 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,288 $204,000 Implemented
SD0549 # 05 Y:2017 05 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $300 Implemented
SD0549 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,056 $3,882 Implemented
SD0549 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $600 Implemented
SD0549 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,048 $4,352 Implemented
SD0524 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,754 $1,310 Implemented