Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0117 # 11 Y:1997 | 11 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $453 | $0 | Implemented |
WV0117 # 12 Y:1997 | 12 | 1997 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,387 | $0 | Implemented |
WV0117 # 13 Y:1997 | 13 | 1997 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,160 | $200 | Implemented |
WV0117 # 14 Y:1997 | 14 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,300,000 | $125,000 | Not Implemented |
UD0497 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $1,514 | $1,500 | Not Implemented |
UD0497 # 02 Y:1996 | 02 | 1996 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,460 | $300 | Not Implemented |
UD0497 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,035 | $20,230 | Implemented |
UD0497 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,760 | $13,724 | Implemented |
TN0588 # 01 Y:1996 | 01 | 1996 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $45,192 | $51,320 | Implemented |
TN0588 # 02 Y:1996 | 02 | 1996 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $14,500 | $13,000 | Not Implemented |
TN0588 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,760 | $5,300 | Implemented |
TN0588 # 04 Y:1996 | 04 | 1996 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $610 | $1,800 | Not Implemented |
TN0588 # 05 Y:1996 | 05 | 1996 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $545 | $0 | Not Implemented |
TN0588 # 06 Y:1996 | 06 | 1996 | INSTALL OCCUPANCY SENSORS | $290 | $845 | Implemented |
NC0095 # 01 Y:1996 | 01 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,105 | $5,000 | Implemented |
NC0095 # 02 Y:1996 | 02 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $641 | $0 | Not Implemented |
NC0095 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $549 | $2,100 | Not Implemented |
NC0095 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,473 | $6,046 | Implemented |
NC0095 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $195 | $90 | Implemented |
NC0095 # 06 Y:1996 | 06 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $439 | $400 | Not Implemented |
NC0095 # 07 Y:1996 | 07 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $367 | $367 | Not Implemented |
NC0095 # 08 Y:1996 | 08 | 1996 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,022 | $320 | Not Implemented |
NC0095 # 09 Y:1996 | 09 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $38 | $100 | Not Implemented |
SD0135 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,152 | $1,450 | Implemented |
SD0135 # 02 Y:1996 | 02 | 1996 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $3,735 | $6,300 | Implemented |