IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,723

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0117 # 11 Y:1997 11 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $453 $0 Implemented
WV0117 # 12 Y:1997 12 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,387 $0 Implemented
WV0117 # 13 Y:1997 13 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,160 $200 Implemented
WV0117 # 14 Y:1997 14 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,300,000 $125,000 Not Implemented
UD0497 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,514 $1,500 Not Implemented
UD0497 # 02 Y:1996 02 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,460 $300 Not Implemented
UD0497 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,035 $20,230 Implemented
UD0497 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,760 $13,724 Implemented
TN0588 # 01 Y:1996 01 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $45,192 $51,320 Implemented
TN0588 # 02 Y:1996 02 1996 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $14,500 $13,000 Not Implemented
TN0588 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,760 $5,300 Implemented
TN0588 # 04 Y:1996 04 1996 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $610 $1,800 Not Implemented
TN0588 # 05 Y:1996 05 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $545 $0 Not Implemented
TN0588 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $290 $845 Implemented
NC0095 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,105 $5,000 Implemented
NC0095 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $641 $0 Not Implemented
NC0095 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $549 $2,100 Not Implemented
NC0095 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,473 $6,046 Implemented
NC0095 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $195 $90 Implemented
NC0095 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $439 $400 Not Implemented
NC0095 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $367 $367 Not Implemented
NC0095 # 08 Y:1996 08 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,022 $320 Not Implemented
NC0095 # 09 Y:1996 09 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $38 $100 Not Implemented
SD0135 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,152 $1,450 Implemented
SD0135 # 02 Y:1996 02 1996 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,735 $6,300 Implemented