Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0217 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $6,607 | $3,000 | Implemented |
MZ0218 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $1,603 | $900 | Implemented |
MZ0218 # 05 Y:2016 | 05 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,810 | $0 | Not Implemented |
MZ0218 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $2,293 | $900 | Implemented |
MZ0217 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,739 | $80,500 | Implemented |
MZ0217 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $668 | $600 | Not Implemented |
MZ0218 # 02 Y:2016 | 02 | 2016 | USE PHOTOCELL CONTROLS | $2,869 | $490 | Implemented |
MZ0217 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $841 | $1,100 | Implemented |
MZ0218 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,078 | $12,500 | Not Implemented |
MZ0217 # 01 Y:2016 | 01 | 2016 | CONDENSE OPERATION INTO ONE BUILDING | $4,197 | $900 | Implemented |
MZ0218 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,572 | $10,350 | Implemented |
MZ0217 # 02 Y:2016 | 02 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,674 | $30,000 | Not Implemented |
MZ0217 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,627 | $20,000 | Not Implemented |
KU0554 # 01 Y:2000 | 01 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,875 | $13,000 | Not Implemented |
KU0554 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,829 | $0 | Implemented |
KU0554 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,480 | $1,810 | Not Implemented |
KU0554 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,445 | $0 | Implemented |
KU0554 # 05 Y:2000 | 05 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $620 | $2,000 | Not Implemented |
KU0548 # 06 Y:2000 | 06 | 2000 | MINIMIZE WATER USAGE | $4,075 | $4,075 | n/a |
KU0548 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,422 | $1,050 | n/a |
KU0548 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,963 | $1,505 | n/a |
KU0548 # 01 Y:2000 | 01 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $13,917 | $0 | n/a |
KU0548 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,604 | $40 | n/a |
KU0548 # 02 Y:2000 | 02 | 2000 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,154 | $11,500 | n/a |
MO0284 # 04 Y:2000 | 04 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $540 | $0 | Not Implemented |