IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0217 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $6,607 $3,000 Implemented
MZ0218 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $1,603 $900 Implemented
MZ0218 # 05 Y:2016 05 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,810 $0 Not Implemented
MZ0218 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,293 $900 Implemented
MZ0217 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,739 $80,500 Implemented
MZ0217 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $668 $600 Not Implemented
MZ0218 # 02 Y:2016 02 2016 USE PHOTOCELL CONTROLS $2,869 $490 Implemented
MZ0217 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $841 $1,100 Implemented
MZ0218 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,078 $12,500 Not Implemented
MZ0217 # 01 Y:2016 01 2016 CONDENSE OPERATION INTO ONE BUILDING $4,197 $900 Implemented
MZ0218 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,572 $10,350 Implemented
MZ0217 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,674 $30,000 Not Implemented
MZ0217 # 06 Y:2016 06 2016 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,627 $20,000 Not Implemented
KU0554 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,875 $13,000 Not Implemented
KU0554 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,829 $0 Implemented
KU0554 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,480 $1,810 Not Implemented
KU0554 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,445 $0 Implemented
KU0554 # 05 Y:2000 05 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $620 $2,000 Not Implemented
KU0548 # 06 Y:2000 06 2000 MINIMIZE WATER USAGE $4,075 $4,075 n/a
KU0548 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,422 $1,050 n/a
KU0548 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,963 $1,505 n/a
KU0548 # 01 Y:2000 01 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,917 $0 n/a
KU0548 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,604 $40 n/a
KU0548 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,154 $11,500 n/a
MO0284 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $540 $0 Not Implemented