IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0219 # 07 Y:2002 07 2002 RECOVER AND REUSE COOLING WATER $8,640 $5,940 Implemented
UM0219 # 06 Y:2002 06 2002 REPLACE BOILER $3,920 $12,000 Implemented
UM0219 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,258 $800 Implemented
UM0219 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $600 Not Implemented
UM0219 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $225 Implemented
UM0219 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,965 $62,826 Implemented
UM0219 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,674 $26,400 n/a
CO0504 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $1,950 Implemented
CO0504 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,040 $7,000 Implemented
CO0504 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $371 $0 Implemented
CO0504 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44 $44 Implemented
SF0231 # 14 Y:2002 14 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,215 $15,574 n/a
SF0231 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $8,403 $913 n/a
SF0231 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,732 $4,138 n/a
SF0231 # 03 Y:2002 03 2002 UPGRADE CONTROLS ON COMPRESSORS $20,883 $15,071 n/a
SF0231 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,328 $42,988 n/a
SF0231 # 15 Y:2002 15 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,241 $7,875 n/a
SF0231 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,557 $20,529 n/a
SF0231 # 13 Y:2002 13 2002 RECYCLE CLEANING SOLVENT AND REUSE $298,889 $560,000 n/a
SF0231 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,389 $280,599 n/a
SF0231 # 11 Y:2002 11 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,491 $6,516 n/a
SF0231 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,934 $27,835 n/a
SF0231 # 09 Y:2002 09 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,658 $8,500 n/a
SF0231 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $7,529 $8,040 n/a
SF0231 # 07 Y:2002 07 2002 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $5,916 $5,753 n/a