IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0307 # 02 Y:2004 02 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $72,400 $49,500 Implemented
NC0307 # 03 Y:2004 03 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $32,361 $24,000 Not Implemented
NC0307 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $16,989 $31,278 Not Implemented
NC0307 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,342 $1,456 Not Implemented
NC0307 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $313 $381 Not Implemented
NC0307 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,171 $100 Implemented
NC0307 # 01 Y:2004 01 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $151,225 $150,000 Not Implemented
SU0196 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,956 $0 Implemented
SU0196 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $344 $888 Not Implemented
SU0196 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $0 Not Implemented
SU0196 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $653 Implemented
SU0196 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,000 $0 Implemented
OR0461 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,372,930 $1,150 Implemented
OR0461 # 02 Y:2004 02 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $303,000 $1,000 Not Implemented
OR0461 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $4,290 $2,690 Implemented
OR0461 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $1,910 $875 Not Implemented
SD0341 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $965 $400 Implemented
SD0341 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,607 $10,000 Not Implemented
SD0341 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,274 $3,721 Not Implemented
SD0341 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $200 Implemented
SD0341 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $961 $600 Not Implemented
CO0544 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,260 $80,750 Not Implemented
CO0544 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $310 $250 Implemented
CO0544 # 04 Y:2004 04 2004 COVER OPEN TANKS $2,630 $2,150 Not Implemented
CO0544 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,600 $300 Implemented