IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

441

matching recommendations
Reset
SIC 3823 Process Control Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0197 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,516 $2,000 Implemented
SD0197 # 08 Y:1998 08 1998 WASH AND REUSE RAGS ON-SITE $711 $600 Implemented
SD0197 # 09 Y:1998 09 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $1,350 $1,000 Implemented
KU0485 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,310 $190 Implemented
KU0485 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $660 Implemented
KU0485 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $470 $300 Implemented
KU0485 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $230 $40 Not Implemented
KU0485 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,170 $5,260 Not Implemented
KU0485 # 06 Y:1997 06 1997 RECOVER AND REUSE COOLING WATER $1,080 $1,180 Implemented
KU0485 # 07 Y:1997 07 1997 METER WASTE WATER $230 $100 Implemented
KU0485 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $128,310 $186,000 Not Implemented
WV0124 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,851 $361 Implemented
WV0124 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,835 $1,740 Implemented
WV0124 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $391 $1,080 Implemented
WV0124 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $150 $290 Not Implemented
WV0124 # 05 Y:1997 05 1997 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,413 $0 Implemented
WV0124 # 06 Y:1997 06 1997 REDUCE VENTILATION AIR $7,818 $6,200 Implemented
WV0124 # 07 Y:1997 07 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,549 $3,268 Not Implemented
WV0124 # 08 Y:1997 08 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,865 $0 Not Implemented
WV0124 # 09 Y:1997 09 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,276 $800 Not Implemented
WV0124 # 10 Y:1997 10 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,097 $11,000 Not Implemented
WV0124 # 11 Y:1997 11 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,924 $10,000 Not Implemented
WV0124 # 12 Y:1997 12 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,143 $1,570 Implemented
WV0124 # 13 Y:1997 13 1997 CHANGE OPERATING CONDITIONS $20,734 $5,000 Not Implemented
TN0588 # 01 Y:1996 01 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $45,192 $51,320 Implemented