IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

432

matching recommendations
Reset
SIC 3823 Process Control Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0665 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,094 $6,844 Not Implemented
OK0665 # 04 Y:2003 04 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,748 $3,480 Implemented
OK0665 # 05 Y:2003 05 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $10,600 $0 Implemented
OK0665 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,398 $1,374 Not Implemented
OK0665 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,550 $13,880 Implemented
OK0665 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $1,048 Implemented
OK0665 # 09 Y:2003 09 2003 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,136 $32,000 n/a
AM0430 # 01 Y:2003 01 2003 USE WATER-BASED ADHESIVES $51,560 $10,000 Not Implemented
AM0430 # 02 Y:2003 02 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,620 $340 Not Implemented
AM0430 # 03 Y:2003 03 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,770 $9,000 Not Implemented
AM0430 # 04 Y:2003 04 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,840 $700 Implemented
AM0430 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $0 Implemented
AM0430 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $850 $77 Implemented
AM0430 # 07 Y:2003 07 2003 REUSE RAGS UNTIL COMPLETELY SOILED $795 $0 Implemented
AM0430 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $280 $90 Not Implemented
AM0430 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $630 Not Implemented
AM0430 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $180 $0 Implemented
CO0466 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,420 $10,000 Implemented
CO0466 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,120 $0 Not Implemented
CO0466 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $540 $870 Not Implemented
CO0466 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $470 $1,000 Implemented
CO0466 # 05 Y:2000 05 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $220 $280 Not Implemented
CO0466 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $640 $0 Implemented
CO0466 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $1,030 $320 Implemented
CO0466 # 08 Y:2000 08 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $50,740 $40,000 Implemented