Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 3824 | Fluid Meters And Counting Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0572 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,426 | $278 | Implemented |
AS0572 # 04 Y:2024 | 04 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,801 | $1,399 | Implemented |
AS0572 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,321 | $1,387 | Implemented |
AS0572 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $258 | $79 | Implemented |
AS0572 # 01 Y:2024 | 01 | 2024 | INSTALL BACK-UP EQUIPMENT | $53,208 | $12,653 | Implemented |
UA0246 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $855 | $1,067 | Implemented |
UA0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,600 | $9,695 | Implemented |
WV0591 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,574 | $1,468 | Implemented |
WV0591 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,927 | $4,625 | Implemented |
WV0591 # 11 Y:2020 | 11 | 2020 | INSULATE BARE EQUIPMENT | $151 | $373 | Implemented |
WV0591 # 01 Y:2020 | 01 | 2020 | ADJUST BURNERS FOR EFFICIENT OPERATION | $10,092 | $27,700 | Implemented |
WV0591 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $6,029 | $6,375 | Implemented |
WV0591 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,647 | $958 | Implemented |
WV0591 # 07 Y:2020 | 07 | 2020 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $1,752 | $4,700 | Implemented |
WV0591 # 09 Y:2020 | 09 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $944 | $338 | Implemented |
CL1905 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,586 | $1,600 | Implemented |
CL1905 # 01 Y:2019 | 01 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,261 | $6,500 | Implemented |
CL1905 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $918 | $2,080 | Implemented |
CL1905 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,489 | $13,085 | Implemented |
CL1905 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $139 | $900 | Implemented |
CL1905 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,441 | $0 | Implemented |
UA0063 # 08 Y:2011 | 08 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $35,465 | $27,200 | Implemented |
UA0063 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,363 | $3,900 | Implemented |
UA0063 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,438 | $23,295 | Implemented |
UA0063 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,938 | $1,003 | Implemented |