Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsSIC | 3824 | Fluid Meters And Counting Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,600 | $9,695 | Implemented |
UA0246 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $855 | $1,067 | Implemented |
WV0591 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,927 | $4,625 | Implemented |
WV0591 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,574 | $1,468 | Implemented |
WV0591 # 11 Y:2020 | 11 | 2020 | INSULATE BARE EQUIPMENT | $151 | $373 | Implemented |
WV0591 # 09 Y:2020 | 09 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $944 | $338 | Implemented |
WV0591 # 01 Y:2020 | 01 | 2020 | ADJUST BURNERS FOR EFFICIENT OPERATION | $10,092 | $27,700 | Implemented |
WV0591 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,647 | $958 | Implemented |
WV0591 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $6,029 | $6,375 | Implemented |
WV0591 # 07 Y:2020 | 07 | 2020 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $1,752 | $4,700 | Implemented |
CL1905 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $918 | $2,080 | Implemented |
CL1905 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,441 | $0 | Implemented |
CL1905 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,586 | $1,600 | Implemented |
CL1905 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $139 | $900 | Implemented |
CL1905 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,489 | $13,085 | Implemented |
CL1905 # 01 Y:2019 | 01 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,261 | $6,500 | Implemented |
UA0063 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,417 | $1,000 | Implemented |
UA0063 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,438 | $23,295 | Implemented |
UA0063 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,938 | $1,003 | Implemented |
UA0063 # 04 Y:2011 | 04 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $28,528 | $3,584 | Implemented |
UA0063 # 08 Y:2011 | 08 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $35,465 | $27,200 | Implemented |
UA0063 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,363 | $3,900 | Implemented |
CO0613 # 07 Y:2008 | 07 | 2008 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,390 | $1,000 | Implemented |
CO0613 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,330 | $9,130 | Implemented |
CO0613 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,500 | $3,000 | Implemented |