IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
SIC 3826 Analytical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0162 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,605 $800 Implemented
DL0162 # 06 Y:2016 06 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,175 $10,500 Implemented
DL0162 # 07 Y:2016 07 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,730 $1,820 Implemented
DL0162 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,930 $29,230 Implemented
DL0160 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,550 $0 Implemented
DL0160 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,935 $211,395 Implemented
MI0254 # 01 Y:2014 01 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $66,980 $10,999 Implemented
MI0254 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,927 $80 Implemented
MI0254 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $17,716 $3,100 Implemented
MI0254 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $5,083 $7,680 Implemented
MI0254 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $2,160 Implemented
MI0254 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,949 $13,170 Implemented
MI0254 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $3,162 $800 Implemented
MI0254 # 12 Y:2014 12 2014 PAY BILLS ON TIME TO AVOID LATE FEES $1,523 $240 Implemented
MI0254 # 13 Y:2014 13 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $1,660 Implemented
MI0254 # 14 Y:2014 14 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $447 $80 Implemented
WV0389 # 01 Y:2009 01 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,844 $1,000 Implemented
WV0389 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $4,703 $662 Implemented
WV0389 # 07 Y:2009 07 2009 USE OPTIMUM THICKNESS INSULATION $2,517 $960 Implemented
WV0389 # 09 Y:2009 09 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,740 $600 Implemented
WV0389 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,462 $2,860 Implemented
WV0389 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $0 Implemented
CO0614 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,500 Implemented
CO0614 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,670 $1,000 Implemented
CO0614 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,010 $12,000 Implemented