Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
Reset
SIC 3826 Analytical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0461 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $1,910 $875 Not Implemented
AS0359 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $14,100 $750 Not Implemented
AS0359 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $73,763 $118,320 Not Implemented
AS0359 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $127 $200 Not Implemented
AS0359 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $558 $850 Not Implemented
AS0359 # 05 Y:2003 05 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,910 $9,710 Not Implemented
UM0219 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,674 $26,400 n/a
UM0219 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,965 $62,826 Implemented
UM0219 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $225 Implemented
UM0219 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $600 Not Implemented
UM0219 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,258 $800 Implemented
UM0219 # 06 Y:2002 06 2002 REPLACE BOILER $3,920 $12,000 Implemented
UM0219 # 07 Y:2002 07 2002 RECOVER AND REUSE COOLING WATER $8,640 $5,940 Implemented
WI0403 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $82,500 $120,000 Not Implemented
WI0403 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,523 $0 Implemented
WI0403 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,035 $9,500 Not Implemented
WI0403 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,569 $16,804 Not Implemented
WI0403 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $188 $630 Implemented
WI0403 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $118 $450 Not Implemented
WI0403 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $685 $3,600 Not Implemented
CO0481 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,690 $2,000 Not Implemented
CO0481 # 02 Y:2001 02 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,370 $0 Implemented
CO0481 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,230 $880 Implemented
CO0481 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,030 $0 Implemented
CO0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $130 Implemented