IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3827 Optical Instruments And Lenses
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0449 # 03 Y:2014 03 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $317 $307 Not Implemented
SF0449 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,804 $9,262 Not Implemented
SF0449 # 01 Y:2014 01 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $660 $280 Implemented
SF0449 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,630 $27,842 Implemented
SF0449 # 04 Y:2014 04 2014 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $28,600 $42,672 Not Implemented
SF0449 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $2,997 $14,024 Not Implemented
SD0460 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $7,050 Not Implemented
SD0460 # 05 Y:2013 05 2013 REPLACE BOILER $4,735 $14,250 Not Implemented
SD0460 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $200 Implemented
SD0460 # 09 Y:2013 09 2013 USE PHOTOCELL CONTROLS $1,249 $1,100 Not Implemented
SD0460 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $731 $2,500 Implemented
SD0460 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,875 $900 Implemented
SD0460 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,515 $3,212 Implemented
SD0460 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $11,357 $1,000 Implemented
SD0460 # 01 Y:2013 01 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,132 $152,300 Implemented
SD0460 # 02 Y:2013 02 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $48,502 $119,500 Not Implemented
SF0231 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,732 $4,138 n/a
SF0231 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $8,403 $913 n/a
SF0231 # 09 Y:2002 09 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,658 $8,500 n/a
SF0231 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,328 $42,988 n/a
SF0231 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,557 $20,529 n/a
SF0231 # 03 Y:2002 03 2002 UPGRADE CONTROLS ON COMPRESSORS $20,883 $15,071 n/a
SF0231 # 06 Y:2002 06 2002 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $2,391 $2,193 n/a
SF0231 # 15 Y:2002 15 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,241 $7,875 n/a
SF0231 # 13 Y:2002 13 2002 RECYCLE CLEANING SOLVENT AND REUSE $298,889 $560,000 n/a