Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
315
matching recommendationsSIC | 3829 | Measuring & Controlling Devices, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0044 # 06 Y:2020 | 06 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $111 | $50 | Implemented |
NL0044 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,007 | $1,000 | Implemented |
NL0044 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,951 | $29,928 | Implemented |
NL0044 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $285 | $20 | Not Implemented |
TT0221 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,435 | $30 | Not Implemented |
TT0221 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,132 | $36,211 | Implemented |
TT0221 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $33 | $80 | Not Implemented |
TT0221 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,958 | $7,400 | Not Implemented |
TT0221 # 02 Y:2019 | 02 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $4,069 | $2,280 | Not Implemented |
LS1902 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,438 | $375 | Not Implemented |
LS1902 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $80 | $70 | Not Implemented |
LS1902 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,492 | $4,720 | Not Implemented |
LS1902 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $743 | $50 | Not Implemented |
LS1902 # 03 Y:2019 | 03 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,699 | $100 | Implemented |
MA0783 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $17,909 | $431,094 | Not Implemented |
MA0783 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,297 | $14,420 | Implemented |
MA0783 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $924 | $2,760 | Implemented |
MA0783 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,697 | $19,975 | Not Implemented |
SD0549 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,048 | $4,352 | Implemented |
SD0549 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $638 | $600 | Implemented |
SD0549 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,288 | $204,000 | Implemented |
SD0549 # 02 Y:2017 | 02 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,056 | $3,882 | Implemented |
SD0549 # 05 Y:2017 | 05 | 2017 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $360 | $300 | Implemented |
BS0077 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $118 | $47 | Implemented |
BS0077 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $370 | $15 | Implemented |