Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
315
matching recommendationsSIC | 3829 | Measuring & Controlling Devices, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0667 # 02 Y:2011 | 02 | 2011 | IMPROVE COMBUSTION CONTROL CAPABILITY | $31,118 | $100,000 | Not Implemented |
MA0667 # 03 Y:2011 | 03 | 2011 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $11,694 | $10,590 | Implemented |
MA0667 # 04 Y:2011 | 04 | 2011 | REDUCE VENTILATION AIR | $8,118 | $0 | Implemented |
MA0667 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,023 | $250 | Implemented |
MA0667 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,246 | $3,000 | Not Implemented |
MA0667 # 07 Y:2011 | 07 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,047 | $17,500 | Not Implemented |
MA0667 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,129 | $6,340 | Not Implemented |
MA0667 # 09 Y:2011 | 09 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,515 | $4,000 | Not Implemented |
MA0667 # 10 Y:2011 | 10 | 2011 | INSTALL AUTOMATIC STACK DAMPER | $729 | $180 | Implemented |
MA0667 # 11 Y:2011 | 11 | 2011 | INSULATE BARE EQUIPMENT | $525 | $550 | Not Implemented |
MA0667 # 12 Y:2011 | 12 | 2011 | INSULATE BARE EQUIPMENT | $98 | $201 | Not Implemented |
MA0576 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,578 | $7,342 | Implemented |
MA0576 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,240 | $3,120 | Implemented |
MA0576 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,505 | $4,283 | Implemented |
MA0576 # 01 Y:2005 | 01 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $33,608 | $2,000 | Not Implemented |
SD0355 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $586 | $648 | Not Implemented |
SD0355 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,531 | $1,040 | Not Implemented |
SD0355 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,397 | $0 | Implemented |
SD0355 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $0 | Implemented |
SD0355 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $897 | $700 | Implemented |
SD0355 # 07 Y:2005 | 07 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,560 | $1,300 | Not Implemented |
SD0355 # 06 Y:2005 | 06 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $15,253 | $18,500 | Not Implemented |
NC0224 # 01 Y:2001 | 01 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,086 | $7,500 | Implemented |
NC0224 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,746 | $5,000 | Not Implemented |
NC0224 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,339 | $1,690 | Implemented |