Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
305
matching recommendationsSIC | 3829 | Measuring & Controlling Devices, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0667 # 12 Y:2011 | 12 | 2011 | INSULATE BARE EQUIPMENT | $98 | $201 | Not Implemented |
MA0576 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,505 | $4,283 | Implemented |
MA0576 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,578 | $7,342 | Implemented |
MA0576 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,240 | $3,120 | Implemented |
MA0576 # 01 Y:2005 | 01 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $33,608 | $2,000 | Not Implemented |
SD0355 # 07 Y:2005 | 07 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,560 | $1,300 | Not Implemented |
SD0355 # 06 Y:2005 | 06 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $15,253 | $18,500 | Not Implemented |
SD0355 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $897 | $700 | Implemented |
SD0355 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $586 | $648 | Not Implemented |
SD0355 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $0 | Implemented |
SD0355 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,397 | $0 | Implemented |
SD0355 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,531 | $1,040 | Not Implemented |
NC0224 # 02 Y:2001 | 02 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $16,136 | $45,000 | Not Implemented |
NC0224 # 06 Y:2001 | 06 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $113 | $300 | Implemented |
NC0224 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,339 | $1,690 | Implemented |
NC0224 # 04 Y:2001 | 04 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $19,065 | $40,000 | Implemented |
NC0224 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,746 | $5,000 | Not Implemented |
NC0224 # 01 Y:2001 | 01 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,086 | $7,500 | Implemented |
UU0007 # 05 Y:2001 | 05 | 2001 | RECOVER AND REUSE COOLING WATER | $953 | $20 | Not Implemented |
UU0007 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,319 | $5,852 | n/a |
UU0007 # 04 Y:2001 | 04 | 2001 | USE SYNTHETIC LUBRICANT | $564 | $400 | Not Implemented |
UU0007 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $3,545 | $7,155 | n/a |
UU0007 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $430 | $430 | Implemented |
DS0174 # 02 Y:2000 | 02 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $403 | $238 | Implemented |
DS0174 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $300 | $540 | Implemented |