IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

315

matching recommendations
Reset
SIC 3829 Measuring & Controlling Devices, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0224 # 04 Y:2001 04 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $19,065 $40,000 Implemented
NC0224 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,339 $1,690 Implemented
NC0224 # 06 Y:2001 06 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $113 $300 Implemented
UU0007 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,319 $5,852 n/a
UU0007 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $3,545 $7,155 n/a
UU0007 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $430 $430 Implemented
UU0007 # 04 Y:2001 04 2001 USE SYNTHETIC LUBRICANT $564 $400 Not Implemented
UU0007 # 05 Y:2001 05 2001 RECOVER AND REUSE COOLING WATER $953 $20 Not Implemented
DS0174 # 01 Y:2000 01 2000 REDUCE VENTILATION AIR $8,393 $4,500 Implemented
DS0174 # 02 Y:2000 02 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $403 $238 Implemented
DS0174 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $300 $540 Implemented
DS0174 # 04 Y:2000 04 2000 AUTOMATE FINISHING PROCESS $45,038 $6,995 Implemented
DS0174 # 05 Y:2000 05 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $365 $0 Implemented
NV0159 # 04 Y:2000 04 2000 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $3,014 $9,025 n/a
NV0159 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $4,203 $688 n/a
NV0159 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,714 $2,756 n/a
NV0159 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,038 $120 n/a
NC0194 # 03 Y:2000 03 2000 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $13,561 $29,000 Implemented
NC0194 # 02 Y:2000 02 2000 INSTALL SKYLIGHTS $3,443 $7,000 Implemented
NC0194 # 01 Y:2000 01 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $429 $835 Implemented
NC0194 # 05 Y:2000 05 2000 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,846 $20,200 Implemented
NC0194 # 04 Y:2000 04 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $483 $400 Not Implemented
SD0228 # 02 Y:1999 02 1999 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $5,156 $4,875 Not Implemented
SD0228 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,513 $16,000 Not Implemented
SD0228 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,410 $6,484 Implemented