Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
86
matching recommendationsSIC | 3829 | Measuring & Controlling Devices, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0549 # 05 Y:2017 | 05 | 2017 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $360 | $300 | Implemented |
SD0549 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $638 | $600 | Implemented |
SD0549 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,048 | $4,352 | Implemented |
SD0549 # 02 Y:2017 | 02 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,056 | $3,882 | Implemented |
SD0549 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,288 | $204,000 | Implemented |
SF0441 # 05 Y:2013 | 05 | 2013 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,828 | $377,867 | Not Implemented |
SF0441 # 04 Y:2013 | 04 | 2013 | COMBINE UTILITY METERS | $1,679 | $3,085 | Not Implemented |
SF0441 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $5,725 | $23,868 | Not Implemented |
SF0441 # 02 Y:2013 | 02 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $651 | $420 | Implemented |
SF0441 # 01 Y:2013 | 01 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $27,444 | $0 | Implemented |
SD0439 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,510 | $5,375 | Not Implemented |
SD0439 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $163,156 | $302,600 | Not Implemented |
SD0439 # 04 Y:2011 | 04 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,851 | $8,326 | Not Implemented |
SD0439 # 05 Y:2011 | 05 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $110,990 | $185,200 | Not Implemented |
SD0439 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,678 | $700 | Not Implemented |
SD0439 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,054 | $100 | Not Implemented |
SD0438 # 06 Y:2011 | 06 | 2011 | INSTALL SKYLIGHTS | $8,562 | $25,530 | Not Implemented |
SD0438 # 05 Y:2011 | 05 | 2011 | OPTIMIZE PLANT POWER FACTOR | $12,712 | $37,600 | Implemented |
SD0438 # 04 Y:2011 | 04 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $28,654 | $53,450 | Not Implemented |
SD0438 # 03 Y:2011 | 03 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,445 | $1,530 | Not Implemented |
SD0438 # 02 Y:2011 | 02 | 2011 | COVER OPEN TANKS | $36,210 | $16,850 | Not Implemented |
SD0438 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,004 | $300 | Implemented |
SD0355 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,397 | $0 | Implemented |
SD0355 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $0 | Implemented |
SD0355 # 07 Y:2005 | 07 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,560 | $1,300 | Not Implemented |