IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

865

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0359 # 02 Y:2013 02 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,316 $2,704 Implemented
LE0359 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $4,813 $1,554 Implemented
LE0359 # 05 Y:2013 05 2013 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $2,575 $22 Implemented
LE0359 # 07 Y:2013 07 2013 REPAIR AND ELIMINATE STEAM LEAKS $2,600 $1,000 Implemented
MI0241 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $16,509 $3,900 Implemented
MI0241 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $11,217 $6,000 Implemented
MI0241 # 03 Y:2013 03 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,040 $80 Implemented
MI0241 # 04 Y:2013 04 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,960 $540 Implemented
MI0241 # 05 Y:2013 05 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,883 $4,691 Implemented
MI0241 # 06 Y:2013 06 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,564 $440 Implemented
MI0241 # 08 Y:2013 08 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,942 $2,196 Implemented
MI0241 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,593 $1,660 Implemented
MI0241 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $686 $1,520 Implemented
WV0468 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,596 $31,932 Implemented
WV0468 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,463 $29,680 Implemented
WV0468 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,865 $3,830 Implemented
WV0468 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,088 $5,770 Implemented
WV0468 # 07 Y:2013 07 2013 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,362 $11,000 Implemented
WV0468 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $731 $225 Implemented
WV0468 # 11 Y:2013 11 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $496 $30 Implemented
WV0468 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $452 $1,125 Implemented
UK1310 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,458 $1,500 Implemented
UK1310 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $418 $870 Implemented
UK1310 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $348 $60 Implemented
WM0022 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,779 $6,480 Implemented