IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

865

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0302 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,381 $0 Implemented
BD0302 # 04 Y:2006 04 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,130 $0 Implemented
BD0302 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $384 $0 Implemented
BD0302 # 10 Y:2006 10 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $344 $500 Implemented
AM0503 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $500 Implemented
AM0503 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $300 Implemented
AM0503 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $27 Implemented
MA0589 # 03 Y:2006 03 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,300 $4,000 Implemented
MA0589 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,311 $3,565 Implemented
MA0589 # 06 Y:2006 06 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,951 $400 Implemented
MA0589 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,060 $1,800 Implemented
MA0589 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $187 $60 Implemented
MA0589 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $800 Implemented
TA0107 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,800 $4,390 Implemented
TA0107 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,100 $128 Implemented
TA0107 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $900 $300 Implemented
GT0812 # 01 Y:2005 01 2005 USE SYNTHETIC LUBRICANT $600 $0 Implemented
GT0812 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $20,280 $10,000 Implemented
GT0812 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $221 Implemented
GT0812 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,096 $24,867 Implemented
MI0119 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,064 $170 Implemented
MI0119 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,450 $96 Implemented
MI0119 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,973 $862 Implemented
MI0119 # 05 Y:2005 05 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,003 $22 Implemented
MI0119 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $714 $52 Implemented